⚙️ FLIK Product Operating System
Philosophy: Strategic Oversight by Ahmad, Execution Drive by azmi. Focus on clear, iterative alignment.
1. Strategic Initialization (Monthly Sync)
- Cadence: 1-2x / Month.
- Time: Week 1 / Week 3 (09:00 - 10:30).
- Attendees: Ahmad, azmi, and Key Team members.
- Goal: Brainstorm, challenge assumptions, and prioritize new initiatives.
- Output: New initiatives added to product-initiatives.md (Status:
⚪ Planned). - Owner: azmi (with Ahmad’s strategic input).
2. Initiative Development Flow (BRD-First Execution)
2.1 Business Requirements Definition (BRD)
- Action: For a
⚪ Plannedinitiative, azmi prepares the Business Requirements Document (BRD). - Content: Outlines the business problem, high-level objectives, key success metrics, and target user.
- Location: As the initial section of the corresponding
Product/specs/INT-XX-[Initiative Name].mdfile. - Status: BRD is in “Draft” status within the spec file.
- Owner: azmi.
2.2 Detailed Spec (PRD) Preparation
- Action: After the BRD is defined by azmi, the Tech Lead (from Engineering) and UI/UX Team draft the Detailed Spec (PRD). This translates the BRD into a technical solution, defining scope (MVP), user flows, technical requirements, and UI/UX designs.
- Location:
Product/specs/INT-XX-[Initiative Name].md(completing the template). - Status: PRD section is in “Draft” status.
- Owner: Tech Lead & UI/UX Team.
2.3 Internal Product Approval (azmi)
- Action: An ad-hoc sync between azmi and the Tech Lead/UI/UX Team is scheduled after the Detailed Spec (PRD) is drafted.
- Goal: azmi reviews the detailed PRD, provides feedback, ensures alignment with the initial BRD and overall product strategy, and gives internal product approval.
- Outcome: The Detailed Spec moves to
🟢 Approved by Productstatus. - Owner: azmi (Internal Product Approval & Feedback).
2.4 CEO Strategic Briefing (azmi & Ahmad)
- Action: An ad-hoc sync (online/quick in-office) between azmi and Ahmad is scheduled after azmi has given internal product approval.
- Goal: azmi presents the initiative, clarifies strategic context and potential impact, ensuring Ahmad is fully informed on the direction.
- Outcome: Initiative in
product-initiatives.mdmoves to🟢 Pending(awaiting execution start). - Owner: azmi (Briefing), Ahmad (Receives Briefing).
2.5 Execution Handoff & Ticketing
- Action: Once a spec is
🟢 Approved by Productby azmi (and Ahmad is aligned), azmi formally hands it off to the Engineering Team for execution. The Tech Lead translates it into actionable tickets in Jira. - Linkage: All Jira tickets must reference the corresponding
Product/specs/INT-XX-[Initiative Name].mddocument. - Owner: azmi (Handoff), Tech Lead (Execution).
3. Communication & Continuous Monitoring (Structured Reporting)
3.1 Daily Initiative Deep-Dive (10 Mins)
- Cadence: Daily (flexible).
- Time: Suggestion: 10:30 - 10:40 AM.
- Attendees: azmi, Tech Lead, (UI/UX if relevant).
- Goal: Quick updates, clarify BRD/PRD details, unblock immediate issues.
- Reporting:
- Format: Short Slack message (
#product-eng) or quick F2F. - Content: “INT-XX: [Brief Update] - On Track / Blocked by [Issue] / Needs decision on [X].“
- Format: Short Slack message (
3.2 Weekly Product Sync (Status & Review)
- Cadence: Thursday (16:00).
- Attendees: azmi, Tech Lead, and Engineering Team.
- Goal: Comprehensive review of progress, risks, and completions.
- Reporting:
- Format: Structured update per active initiative (presented in sync, or pre-shared in Slack).
- Content (per INT-XX):
- Status:
On Track/At Risk/Missed/Complete. - Progress: What was achieved this week?
- Why (if Missed/At Risk): Root cause of delay/issue.
- Next Steps: What is planned for next week?
- Status:
- Outcome:
azmiupdatesproduct-initiatives.mdbased on this detailed input.
3.3 Feature Completion Notification
- Action: Tech Lead/Engineering notifies
azmiin Slack (#product-eng) when a feature is complete and ready for internal review/QA. - Goal: Trigger
azmi’s internal review and prepare for potential release.
3.4 Ad-Hoc Escalations & Decisions
- Channel: Slack (
#product-engor direct DM). - Goal: Immediate unblocking for critical issues, quick decisions, and real-time updates.
- Owner: Engineering Team (Escalation), azmi (Decision/Unblock).
4. Tools & Source of Truth
- Strategy & BRDs Master:
Obsidian Vault(Owner: azmi, published via Cloudflare Pages). - Detailed Specs (PRDs):
Product/specs/folder within Obsidian. - Execution & Task Management: Jira (Engineering Team).
- Real-time Comms: Slack (
#product-eng).
5. Definition of Done
- A feature is not done until:
- It works on Production (or Staging).
- It is tracked (Relevant metrics/events are firing).
- It is internally reviewed by azmi.
- azmi approves the release to Production (after internal review).
6. Post-Release Checklist (The Launchpad)
- User Documentation: (Owner: azmi / Product) Update Help Center articles, FAQs, or create user guides.
- Internal Knowledge Base: (Owner: azmi / Product) Update
Product Catalog,product-overview.mdwith new features/changes. - Communication Message: (Owner: azmi / Marketing) Draft release notes (internal/external), changelog entries, marketing communication plan.
- Sales Enablement: (Owner: azmi / Sales) Brief Sales team on new features, benefits, and how to pitch them. Update Sales Playbooks/FAQs (
~/Vault/Projects/FLIK/sales/). - Performance Monitoring: (Owner: Tech Lead / azmi) Verify key metrics (from BRD/PRD) are correctly tracked in Analytics. Monitor for bugs/performance issues in the first 24-48 hours.
This Product Operating System is a living document. It will evolve as FLIK grows and processes mature.